Table Talk
Nothing here yet. Love this design? Say so - the designer might see it.
Log in to join the conversation.
Power Grid Insert
Inserts
Free
Plan Your Print
Sign in
to track this print from Want to Printed.
About 475 g of filament
Print Profile (2) Single color 10h 14m 475 g PLA
Single color
3 plates
10h 14m
475 g PLA
P1S, X1 Carbon, X1, H2D, H2S, P2S, X1E, P1P, H2C, H2D Pro, A1, X2D, A2L
Contains plates for single color print.
Plate 8 is an optional stop token.
0.2mm layer, 2 walls, 10% infill
Plate Details (3)
0.4 mm nozzle, all plates
Plate 1 · Single color - Plate 1 of 2
4h 28m
224 g
PLA · 224 g
Plate 2 · Single color - Plate 2 of 2
4h 44m
225 g
PLA · 225 g
Plate 3 · Optional - Stop tokens
1h 2m
26 g
PLA · 8 g
PLA · 18 g
Colored rims
6 plates
10h 58m
487 g PLA
P1S, P1P, X1, X1 Carbon, X1E
0.2mm layer, 2 walls, 10% infill
Plate Details (6)
0.4 mm nozzle, all plates
Plate 1 · Colored - Plate 1 of 5
1h 27m
66 g
PLA · 6 g
PLA · 54 g
PLA · 6 g
Plate 2 · Colored - Plate 2 of 5
2h 57m
146 g
PLA · 12 g
PLA · 11 g
PLA · 123 g
Plate 3 · Colored - Plate 3 of 5
1h 35m
74 g
PLA · 62 g
PLA · 6 g
PLA · 6 g
Plate 4 · Colored - Plate 4 of 5
1h 44m
78 g
PLA · 12 g
PLA · 66 g
Plate 5 · Colored - Plate 5 of 5
2h 13m
97 g
PLA · 97 g
Plate 6 · Optional - Stop tokens
1h 1m
26 g
PLA · 8 g
PLA · 18 g
As sliced by the designer. Your printer, filament, and settings may change these numbers.
Designer's Description
Insert for the board game Power Grid, using the existing cardboard insert-frame.
Enough space for upgraded resource tokens and powerplants .
Contains plates for single color print, or with colored rim.
So either print only plates 1+2, or plates 3-7.
Plate 8 is an optional stop token.
Happy gaming!
Power Grid 2004
Lift the Lid
Cover Colors
Expansions
Power Grid: Bremen/Manhattan 2024
Power Grid: Europe/North America 2021
Power Grid: The New Power Plants – Set 2 2021
Power Grid: Middle East/South Africa 2019
Power Grid: Fabled Expansion 2017
Show 14 more
Power Grid: The Stock Companies 2015
Power Grid: Australia & Indian Subcontinent 2013
Power Grid: Northern Europe/United Kingdom & Ireland 2012
Power Grid: Québec/Baden-Württemberg 2012
Funkenschlag: Speicherkraftwerk 2011
Hoogspanning: Het Verre Oosten 2011
Power Grid: The Robots 2011
1
Power Grid: Russia & Japan 2010
Power Grid: Brazil/Spain & Portugal 2009
Power Grid: China/Korea 2008
Power Grid: The New Power Plants – Set 1 2007
Atolla Modulis (fan expansion for Funkenschlag) 2006
Power Grid: Benelux/Central Europe 2006
Power Grid: France/Italy 2005